269259
Evonik Operations GmbH
Designations
Conformity assessment annexesArticle 14
Designated since2006-04-09
Full scope text from the register
Annexes
- Article 14
Procedures
- All procedures as for Art 12 of this directive
Products
- Pressure equipment
Conformity assessment annexesAnnex III - Module C2, Annex III - Module F, Annex III - Module A2, Annex III - Module G
Designated since2016-02-11
Full scope text from the register
Annexes
- Annex III - Module C2, Annex III - Module F, Annex III - Module A2, Annex III - Module G
Procedures
- Conformity based on unit verification, Internal production control plus supervised pressure equipment checks at random intervals, Conformity to type based on internal production control plus supervised pressure equipment checks at random intervals, Conformity to type based on pressure equipment verification
Products
- ALL
Conformity assessment annexesAnnex III - Module C2, Annex III - Module F, Annex III - Module A2, Annex III - Module G
Designated since2016-02-11
Full scope text from the register
Annexes
- Annex III - Module C2, Annex III - Module F, Annex III - Module A2, Annex III - Module G
Procedures
- Conformity based on unit verification, Internal production control plus supervised pressure equipment checks at random intervals, Conformity to type based on internal production control plus supervised pressure equipment checks at random intervals, Conformity to type based on pressure equipment verification
Products
- ALL
Source: EU Single Market Compliance Space (SMCS), retrieved 2026-06-23.
https://webgate.ec.europa.eu/single-market-compliance-space/notified-bodies/free-search?text=269259
https://webgate.ec.europa.eu/single-market-compliance-space/notified-bodies/free-search?text=269259
This page is an informational mirror of the official register. It is not affiliated with the European Commission. Always verify the current designation and scope against the official SMCS record before relying on it.