2812
Element Materials Technology Rotterdam B.V.
Designations
Conformity assessment annexesAnnex IV, Annex V, Annex VI, Annex III, Annex VII, Annex IX, Article 13(1)(b)(ii) of the Directive
Designated since2023-01-30
Full scope text from the register
Annexes
- Annex IV, Annex V, Annex VI, Annex III, Annex VII, Annex IX, Article 13(1)(b)(ii) of the Directive
Procedures
- Acknowledgement of receipt of technical documentation provided by a manufacturer conducting Internal Production Control (Module A), Conformity to type based on quality assurance of the production process (Module D), Conformity based on unit verification (Module G), Conformity to type based on product verification (Module F), EU-type examination (Module B), Conformity to type based on internal production control plus supervised product testing (Module C1), Conformity to type based on product quality assurance (Module E)
Products
- Group I non-electrical:
- - Category M1 equipment
- - Category M2 equipment
- Group II dust non-electrical:
- - Protective systems
- Group II gas non-electrical:
- - Category 3 equipment
- Group II dust electrical:
- - Category 2 equipment
- - Components
- Group I electrical:
- - Category 1 equipment
- Group II gas electrical:
Conformity assessment annexesArt.15.2 (a), Annex II - Module B, Art.15.2 (a), Annex II - Module D, Art.15.2 (a), Annex II - Module E
Designated since2024-08-20
Full scope text from the register
Annexes
- Art.15.2 (a), Annex II - Module B, Art.15.2 (a), Annex II - Module D, Art.15.2 (a), Annex II - Module E
Procedures
- EC type-examination, Production quality assurance, Product quality assurance
Products
- Fire protection equipment
Source: EU Single Market Compliance Space (SMCS), retrieved 2026-06-23.
https://webgate.ec.europa.eu/single-market-compliance-space/notified-bodies/free-search?text=2812
https://webgate.ec.europa.eu/single-market-compliance-space/notified-bodies/free-search?text=2812
This page is an informational mirror of the official register. It is not affiliated with the European Commission. Always verify the current designation and scope against the official SMCS record before relying on it.